Wednesday, February 8, 2012

Movin On

If only all of this ceiling had a finish on it, I could say it was done. But right now I'm concentrating on finishing the outside and it''s gonna have to wait for a little while.




Monday, February 6, 2012

Full Moon Monday







Picked up the cherry lumber from the mill today and ended up with 239 bf out of the logs that were given to me. I took all the boards directly to the kiln mill to dry and plane. It's amazing how cheap all of this milling is, and my cherry graded out at #1 stuff. The goal for the week is to get all of the cedar post up with the exception of the 2 massive ones in front, get all of the railing done, and do alot of little things on the exterior to get ready for the rock. I kinda got a lot of my running around done last week, so I hope to concentrate on construction this week. I need to completely finish the outside so I can move inside and get this puppy done. Around 10 days of  work is left on the outside, excluding the rockwork. My best guess is 2 to 3 months on the interior, but I would love to be done by the end of april. Took a hike into Hide Out Hollow on sunday with brother Scott and his buddy Jim and all our boys, we had a blast and it was quite the adventure for all of us. It is so cool to have another awesome place to hike within 5 miles of the house. Hopefully we can do a couple more hikes this winter, it feels so good getting out some, and this is what we moved here for. Meanwhile, the spring rolls that Nick cooked for me on saturday were incredible and we had another great meal at the Low Gap Cafe. I also confirmed to play a gig there on sat. feb. 18th. Hope some folks come out and join us. Have an awesome week. Hollohead