Saturday, August 25, 2012

Cabinets Arrive

What a day! Cabinets were delivered, exterior rock work is just about complete, and interior doors are in Harrison. I will install the cabinets tomorrow and call for the granite tops, which should be installed in about 3 weeks. I think I have convinced Scott to come back and set all the remaining interior doors, and that's about all I need from him. The plan is to move in and finish up while we live there, something that is not the best, but at least I get to keep right on working every day to finish. There's really not much left on the outside either, mainly the front entry porch and part of the french drain. My main problem now is finding some wide cherry to complete the paneling in the awesome room, I have material for everything else needed to complete the house. The cabinets are great looking cherry with shaker style, and I will spend all  day tomorrow installing them. After that, I will spend the rest of my time completing all of the interior trim work. 4 weeks left till our self imposed deadline to move in. I guess we will let everyone know when to come over and help us move, I know how much everyone loves to move.  It's supposed to rain this weekend, but since it's only a 60% chance, that basically means no chance, so I will get  a lot done.

No comments:

Post a Comment